DERpass · Players
DERpass removes the translation layer between the parties who install, operate, finance, and regulate distributed energy resources. Every player gets exactly what they need from a single structured file — without a proprietary platform in between.
Select a player to see their specific pain points, requirements, and how DERpass addresses them.
Component data is re-keyed multiple times across ERP, DSO portals, and handover documents. Commissioning reports live in PDF folders. Handing over to an O&M provider means emailing a ZIP and hoping nothing is lost.
View details →Each managed asset has its own spreadsheet, partially filled by whoever installed it. Maintenance history sits in a ticket system disconnected from asset data. Owner reports require pulling exports from three or more tools.
View details →Connection requests arrive on paper or proprietary portals — all different. DSO staff re-type nameplate data into internal GIS and SCADA systems. Transcription errors cause delays and re-submissions.
View details →Establishing chain of title for a PV asset can take weeks. Documents are scattered across filing cabinets, email, and installer hard drives. There is no standard way to prove what was installed, by whom, or what changed.
View details →Data rooms contain PDFs that cannot be queried. Technical data, yield records, and contract terms arrive in incompatible formats from different parties. Bankability assessments stretch over weeks of back-and-forth.
View details →Underwriting relies on owner self-reporting via questionnaires that cannot be independently verified. Component age, maintenance frequency, and protection settings are rarely available in a consistent format.
View details →